Labour requirements report
CLEM.Reporting.ReportLabourRequirements
A visual report of all labour required by the simulation

Labour requirements are allocated to activities as needed with the type of labour that can perform the task specified with nested labour filter groups. This report shows what labour is needed and who can perform the task for each activity that supports the allocation of labour in the simulation.
Provide example and screen grab showing this report.
This dynamic report shows the current state of the simulation set up and does not require running the simulation or any settings.
A single instance of this report component is added in each simulation branch of the simulation tree if needed
A html version of this report will be created when displayed in the user interface that can be displayed in a web browser in a separate window. This report will be saved in the directory containing the simulation file (*.aspimx) and will be named LabourAllocationSummary.html and a link to the report provided in the Summary tab.

- Only activities capable of including a labour requirement are displayed in the list.
- Activities with no labour requirement provided are displayed with grey text.
- Multiple rows of icons (circles) for a given activity show where more than one individual is required.
- The preferential allocation of labour is displayed as: first preference (green), second preference (blue), third (pink) and forth or later preference (orange).